5 Feb 2006 : Garage Doors continued

The garage work continues. We had an appointment for the measurement guy to come out and measure the openings for the installation. Toby had arranged to leave the back gate open for him, so he walked in, made some measurements and left without talking to her. He had to come back the next day because he had measured the existing garage door! Hello? Hello? I placed an order for measurements for 2 new 9 foot garage doors. He measured the existing single 15 foot door. Duh.
After some phone calls back and forth with the installation company, we finally got a measurer out on Saturday while Pop and I were home. He was not very flexible and basically told us we had to recess the garage door 4 inches to get an installation. We had placed the new garage wall on the outside of the existing wall, and we were glad to get the extra 4 inches of parking space. But alas… We flushed up the edges of the garage doors and ordered a ‘low-head room’ track system.
We also started working under the house. Dig dig dig.

No pictures this week as the garage doors were always covered up.