We cranked away at the floor joists of the second floor and were able to lay down about 3/4 of the floor sheeting. Greg reminded me that layout was all important when he had to rip out about a dozen pieces of blocking that I had put in that didn’t hold the joists to spacing of 14.5″. Mark and I also started the sheeting in the wrong direction, so Pop, Mark and I got back up there at 8:30p and ripped up the 3 sheets we had already laid down so that the glue could be scraped off before drying. The floor looks huge without any walls to break it up.